The clean room for plant decoration must be constructed according to the design drawings, and the design needs to be modified during construction shall be notified by the design unit. No drawings and technical requirements can not be construction and acceptance. Clean room building decoration construction schedule arrangement should be with other professional types of work to develop a clear construction cooperation plan, according to the procedure of construction, cooperate with each other.
The architectural decoration construction of clean room shall be carried out after the completion of roof waterproofing works and outer enclosure structure, the installation of outer doors and windows and the acceptance of the main structure. The contents include interior decoration works, installation of doors and windows, gap sealing, and sealing operations of gaps at the combination of various pipelines, lighting lamps, purification air conditioning equipment, process equipment and other parts with the building. Elastic sealing materials and dustproof coatings used for caulking in clean rooms must be provided with instructions indicating the composition, variety, delivery date, storage validity period and construction method, as well as product qualification certificates. Expired products and unidentified products shall not be used.
National sales hotline 7*24 hours
Room 506, Nanguo Business Building, 433 Helong Fifth Road, Renhe Town, Baiyun District, Guangzhou City, Guangdong Province